Client:

Hochgurgler Liftgesellschaft mbH & Co.KG

Job:

Draft documentation required to comply with the nature conservation law; avalanche protection concept and safety analyses for the planned cableway; ski run development; planning the avalanche blasting ropeway in cooperation with the company Doppelmayr Seilbahnen GmbH; drafting a service specification for the foundation of the support and deflection pillars; structural engineering of the drive station.

DSC03205

Challenges:

The client intended to remove the existing draglift ‘Kirchenkar’ and replace it with the first section of the 10-seater monocable gondola. In addition, plans existed to build a second section in the eastern Kirchenkar and thus create an attractive extension of the existing ski area.

Realisation:

2014 - 2018

03 Lawinenschutzkonzept