Kirchenkar 10-seater monocable gondola
Client:
Hochgurgler Liftgesellschaft mbH & Co.KG
Job:
Draft documentation required to comply with the nature conservation law; avalanche protection concept and safety analyses for the planned cableway; ski run development; planning the avalanche blasting ropeway in cooperation with the company Doppelmayr Seilbahnen GmbH; drafting a service specification for the foundation of the support and deflection pillars; structural engineering of the drive station.
Challenges:
The client intended to remove the existing draglift ‘Kirchenkar’ and replace it with the first section of the 10-seater monocable gondola. In addition, plans existed to build a second section in the eastern Kirchenkar and thus create an attractive extension of the existing ski area.
Realisation:
2014 - 2018